Week 25: more painting and electrical stuff
I passed on the paints to the guys on Friday, for them to do the work on Saturday and Sunday. Here’s what we chose:
Dulux Trade (only paints we’ll use) Chiffon White 4 for the hallways and stairs:
It’s a good neutral which will go with both my mother-in-law’s vanilla based bedroom & bathroom colour, as well as the blues, greys and yellows we are using on the ground and first floor.
For the kitchen we’re using Dulux Trade Quartz Flint 4, a pale grey which will work with the cabinets:
And finally, the living room. Yeah, we went for it. Bright blue. It’s not as bright in person, painted as the tub of paint would make you think…but it’s still quite a lovely bright blue. Dulux Trade Royal Regatta 3:
Here is what it looks like in person with the new lights (chandelier and wall lights).
The kitchen and hallway/staircases haven’t been painted yet as they are still working on some plastering and prep work.
What has been done are a lot of the lights:
The entry/front hall light. I wanted something that wasn’t too imposing but still was a bit different.
The shabby chic light in our guest bedroom (more off white than grey, unlike this pic).
I used the old living room light for the exercise/guest/tv room.
Our office light.
I’m going to hold off from sharing my bedroom lights mainly because the pics I took of them just weren’t great. Next time you see the master bedroom, it’ll be fully finished.
A few bathroom details have been added, though neither my mother-in-law’s nor our master bathroom is fully finished.
My MIL’s bathroom – added the towel rack and mirrored cabinet.
Our lit mirror (which also has a demister). It’s the same width as the cabinets which means I won’t have to share with my husband (yay!).
Our towel rack, which I love, love, love. It is so different from anything else I saw out there.
And our shower…with an extra handset on the tub filler (which will make it easier to wash my hair while luxuriating in the tub).
We were meant to have our worktops in the kitchen put in, but there were a few issues that came up. I’m hoping that we’ll be ready to get them by the end of the week. We shall see. We still have to have the ground floor waxed, which will take up two days of work and then need at least 2-4 days to dry enough to really do much on it. We can’t move in until at least a week after this has happened.
Our carpet is scheduled to be put in on Dec 7 and we’d like to move in on Dec 16. That’s only 2-1/2 weeks away. Will it happen? I’m guessing no. I’d love to schedule the move but I’m just not ready to do it. Bah.